Our Portfolio

We thrive on Customer'satisfaction

PATONG BAY HILL RESORT PHUKET-THAILAND 2018

Inspection for Commissioning & Handing Over of Phase I comprising the following: 101 Rooms 5 large swimming pools 24 rooms have their own Jacuzzi (plunge pool) on the balcony Common areas of the three buildings and their surroundings Technical Rooms including all electrical and mechanical equipment The inspection covered the following: All finishing works and materials (Tiling, false ceiling, walls, Lighting & Wiring devices, Sanitary ware, Doors & Windows), Usability of the spaces, MDBs, MCPs, Fire Detection Systems, Access Control Panels, Emergency Lighting Systems, Booster Pumps, Submersible Pumps, Speed Controller, Filters, Swimming Pool Systems including air jet pumps, Lightning protection system, Earthing system, Air-condition and Ventilation system, Waste Treatment System, General safety and accessibility Our recommendations covered all the aspects of this project and extended to the energy management due to the intense use of electrical power

THE GREENS PHUKET RESIDENTIAL COMPLEX PHUKET- THAILAND $ 5.5 M 2012-2017

A complete real estate development process: Cash-Flow projection & Valuation, Due Diligence & Servitude, Company set up, Contracts drafting, Tender drawings: Structure, Architecture, Electrical & Mechanical , BOQ preparation and selection of subcontractors, Project management and site supervision, Planning, Cost Control and materials selection, Execution of all works: Excavation, Structural, Concrete, MV substation, MDB, Infrastructure, Swimming pools , Pumps, Water filtration, Rain water harvesting, Landscaping, Finishing works, Handing over to the clients as per contracts and within the set deadline

OLD PRIVATE RESIDENCE RESTORATION LEBANON $270,000 2016-2017

Restoration works of an old residence including: Shop Drawings, As Built Drawings Design and BOQ set up Natural Stones building Sand Blasting Filling & Plastering Electrical works: Lighting, Data, Control panels , TV, Fire Detection Mechanical works: Plumbing, Ventilation, Diesel oil piping, Irrigation system, Fire Fighting Landscaping Kitchen and wood works and Aluminum works Finishing works

TNYou DAY SPA - BEIRUT ASHRAFYIEH - LEBANON $230,000 2004-2005

Restoration works of an old house and turning it to a DAY SPA & Hair Design salon including: Shop Drawings, As Built Drawings Design and BOQ set up Stone Pillars & old tiles restoration Filling & Plastering Electrical works: Lighting, Data, Control panels , TV, Fire Detection, CCTV, Intrusion detection Mechanical works: Plumbing, HVAC Wood and Gypsum works Finishing works

MAZRAAT YACHOUH 2944 RESIDENTIAL BUILDING MAZRAAT YACHOUH-LEBANON $M2.3 2009-2011

A complete real estate development process from tender drawings ( Structure, Architecture, Electrical & Mechanical) and BOQ preparation to selection of subcontractors, then project management and materials selection and approval then finally handing over to the clients as per contracts and within the set deadline.

CASINO DU LIBAN KESRWAN-LEBANON $M5.4 1995-1996

H.V.A.C- Steam- Plumbing- Fire Protection ( sprinklers, F.H.C, FM 200, CO2) - Fuel oil - L.P.Gas- Comp Air - Fountains- Pumping Stations- Water Filtration & Softening, all related Electrical works- Motor Control Centers- Instrumentations & Control - Building Management System. 1996-2001 24/24 Operation & Maintenance & Preventive Mechanical & Electro-Mechanical Works.

BANQUE DU LIBAN BEIRUT-LEBANON $M1.54 1998-2000

H.V.A.C - Plumbing - Fire Protection ( Sprinklers, F.H.C )- Motor Control Centers & all related Electrical Works Complete Building Management System - ( BMS )

LEBANESE AIRLINE CATERING COMPANY BEIRUT-LEBANON $M2.06 1997-1998

24/24 Operation & Maintenance & Preventive Mechanical & Electro-Mechanical Works.

MILITARY COMPLEX KASLIK KASLIK-LEBANON $1,138,530 1998-2001

Generators, Electrical substation, Double Change Over Switch - All Electrical Works including low current and Lightning Protection systems - Motor Control Centers – Building Management System (BMS)- H.V.A.C - Plumbing - Indoor & Outdoor Swimming pools - Floor Heating - Saunas - Jacuzzi - Water Filtration & Treatment - L.P Gas - Fuel Oil - Kitchen's Equipment . (Design & Tender documents and BOQ preparation, Execution & Project Management, Operation & Maintenance )

MILITARY COMPLEX BEIRUT-LEBANON $M1.6 2000-2001

Generators, Electrical substation, Double Change Over Switch - All Electrical Works including low current and Lightning Protection systems and UPS and LED generator - Motor Control Centers – Building Management System (BMS)- H.V.A.C - Plumbing - Indoor & Outdoor Swimming pools - Floor Heating - Saunas - Jacuzzi - Water Filtration & Treatment - L.P Gas - Fuel Oil - Kitchen's Equipment . (Design & Tender documents and BOQ preparation, Execution & Project Management, Operation & Maintenance )

DON BOSCO TECHNIQUE-FIDAR JBEIL-LEBANON $275,000 2001-2002

H.V.A.C - Plumbing - Fuel Oil - All related electrical works - Motor Control Centers.

MILITARY SPORTS STADIUM DEKWANEH-LEBANON $650,000 2000-2002

All Electrical Works including low current and Lightning Protection systems- Motor Control Centers –H.V.A.C - Plumbing - Fuel Oil – Fire Fighting . (Shop Drawings and BOQ preparation, Execution & Project Management)

PLATINUM TOWER BEIRUT-LEBANON $M8.2 2006-2009

H.V.A.C - Plumbing - Fire protection ( sprinklers, F.H.C, Inergen Suppression System ) Fuel Oil - L.P Gas - Fountains - Swimming Pools - R.O Plant - Pumping Stations - Water Filtration & Softening, Motor Control Centers & all related Electrical works - Complete building management System - ( BMS ) (Shop Drawings and supervision of the execution of the electro-mechanical works and cost control)

SURSOCK TOWER ASHRAFYIEH- LEBANON $400,950 2006-2009

Shop Drawings, Supervision, Submittal of Drawings and Material to the consultant and owner representative, Supply of Labor works for all plumbing works and Ventilation and ducting works in the common areas and Car Park as well as installation of the diesel oil system and the mechanical rooms including the boilers.

TESHREEN UNIVERSITY HOSPITAL LATKIA-SYRIA 800 BEDS $5,593,903 2007-2011

H.V.A.C, Steam, BMS, with all related Electrical works. (Shop Drawings and supervision of the execution of the electro-mechanical works and cost control)

SAINT ELIAS CHURCH DEEK EL MEHDI- LEBANON $M1.3 2010-2012

Design, BOQ preparation, Cost estimation and Planning of the Electrical works (Lighting, Data, Sound) and the Mechanical works (HVAC & Plumbing) and all the electrical works related to the mechanical equipment.

AUH BUILDING 56 BEIRUT- LEBANON $2,150,200 2005-2007

Electrical Systems including Nurse Call & PA systems, Main Distribution Boards, Motor Control Centers, Data and Telephone systems and all electro-mechanical works related to HVAC & Plumbing. (Preparation of the submittal of materials and getting the approval of the consultant, request of quotations and price negotiations with the suppliers in order to meet the budget set wrongly. After our intervention the electrical lot which was set to a loss turned to a profit)

SAINT JOSEPH SCHOOL KORNET CHEHWAN- LEBANON $M1.36 2009-2011

Set up a complete Operation & Maintenance schedule for all the electrical (Generators, Distribution boards, Data and telephone network) and mechanical equipment (Plumbing network, A/C, Boilers, Heat exchangers, Diesel oil network, Fans) as well as a maintenance schedule for all civil works. Installed a complete filtration station for potable water and a new piping network and pumping station. Installed a new pumping station with lead lag alternating sequence to save energy. Implemented a lighting fixtures retrofit.